Report Summary:L.A.N, & FIBRE OPTIC UP-LINK INSTALLATION TO ELDORET BOUND OFFICE
  1. Description of Works Done:
  • Trench Works for Fibre Optic Cable Routes.
    • Fibre Optic Up-link Installed through the newly deployed microtunnel to connect and link the existing infrastructure in the server room to the Eldoret bound wing of the weighbridge. 
  • 2KVA Rack-Mountable SMART UPSs Installed and Configured for optimum operation.
  • Approved additional L.A.N & Fibre Optic Equipment setup and installation carried out successfully. 
  • Equipment Used:
    • Standard Network & Fibre Optic Installation Tools.
    • L.A.N Active & Passive Equipment as per the attached Letter.
  • Approved Materials:
  • Fibre Optic Cable.
    • HDPE Pipes
  • Professional Personnel:
  • ICT & Networks Specialists.
  • Works Images