Report Summary: | L.A.N, & FIBRE OPTIC UP-LINK INSTALLATION TO ELDORET BOUND OFFICE |
- Description of Works Done:
- Trench Works for Fibre Optic Cable Routes.
- Fibre Optic Up-link Installed through the newly deployed microtunnel to connect and link the existing infrastructure in the server room to the Eldoret bound wing of the weighbridge.
- 2KVA Rack-Mountable SMART UPSs Installed and Configured for optimum operation.
- Approved additional L.A.N & Fibre Optic Equipment setup and installation carried out successfully.
- Equipment Used:
- Standard Network & Fibre Optic Installation Tools.
- L.A.N Active & Passive Equipment as per the attached Letter.
- Approved Materials:
- Fibre Optic Cable.
- HDPE Pipes
- Professional Personnel:
- ICT & Networks Specialists.